Site under maintenance  ·  Some features might not function properly.
Home/IONET Backup Energy/Plant on Lease
THE CONSUMER MODEL

IONET Backup Energy
Plant on Lease.

A plant configured for the energy requirement and supported through its lifecycle.

IEEL assesses the energy requirement and defines the applicable plant configuration and integration. The plant is the leased asset; its energy is consumed at the user end.

Generated industrial hall configured for IONET Backup Energy Plant infrastructure IONET BACKUP ENERGY PLANT CONFIGURED FOR THE ASSESSED ENERGY REQUIREMENT
01 / IONET BACKUP ENERGY PLANT ON LEASE

How a plant lease
takes shape.

The engagement moves from an application enquiry and technical assessment to plant definition, formal lease documentation, commissioning and operating support.

CONNECTED PATHWAY
  1. 01Enquiry
  2. 02Assessment
  3. 03Plant definition
  4. 04Lease agreement
  5. 05Commissioning
  6. 06Operation & support
02 / IONET BACKUP ENERGY PLANT ON LEASE

Two application
pathways.

The plant can support an affected function in an existing lifecycle or be configured around a new application requiring independent energy availability.

01 / EXISTING ENERGY LIFECYCLE

Continue with the usable system.

Assess the affected function, identify where interruption occurs and integrate the IONET Backup Energy Plant with the usable parts of the existing lifecycle.

Existing lifecyclePlant integrationContinuous consumption
Explore the existing-energy journey ↗
02 / NEW ENERGY REQUIREMENT

Configure around the intended use.

Define the lifecycle functions, capacity and interfaces required for the new application, starting with the consumption requirement at the point of use.

New requirementPlant definitionIndependent availability
Explore the new-energy journey ↗
03 / IONET BACKUP ENERGY PLANT ON LEASE

What continues after
commissioning.

Depending on the agreed application, the relationship can include operation, technical support, monitoring, E Cylinder exchange, inspection, preventive maintenance, review and applicable upgrades or replacement.

01

Operate & monitor

Support for the plant's agreed operation and visibility into its continuing performance.

02

Inspect & maintain

Technical inspection, preventive maintenance and support according to the defined scope.

03

Review & adapt

Application review and applicable upgrades, restoration or replacement when required.

In contextThe relevant lease agreement determines the specific scope, service levels, responsibilities and commercial terms.
04 / IONET BACKUP ENERGY PLANT ON LEASE

E Cylinder exchange and
end-of-lifecycle handling.

The used E Cylinder can be collected, inspected, restored and returned to circulation. Plant end-of-lifecycle arrangements can include recovery, refurbishment, replacement and material handling as applicable.

CONNECTED PATHWAY
  1. 01Cylinder in use
  2. 02Exchange
  3. 03Collection
  4. 04Inspection
  5. 05Restoration
  6. 06Reuse

The exchange pathway supports continued use while the returned E Cylinder moves through inspection and restoration. Exact handling arrangements follow the applicable plant configuration and lease documentation.

YOUR NEXT STEP

Start with your energy requirement.

Share the application, site, existing infrastructure or new requirement, and the consumption the plant must support.